Installation of a water treatment system for the needs of a fatty acid plant


The Company’s installation team completed the installation and put into operation the water treatment system for the needs of the fatty acid plant.
Water treatment equipment is able to provide ultra-pure water, confirmed by an accredited laboratory, consumers of the enterprise in the amount of more than 330 m3 per day. Implementation and technological methods of water treatment take into account the characteristics of all consumers of the enterprise – from a complex technological process to the household needs of employees.

Installation of a water treatment system for the needs of the UTEX418 plant

Installation of a water treatment system for the needs of the UTEX418 plant

Installation of a water treatment system for the needs of the UTEX418 plant