Organization of water supply of oil extraction plant
Installation and commissioning of water supply for the needs of the oil extraction plant have been completed.
To provide water to all consumers of the plant, our specialists selected and delivered the necessary equipment for three wells.
Pumps have been installed and piping them. To reduce electricity consumption, the pumps are equipped with frequency converters.
The automation system based on industrial controllers constantly monitors the operation of the entire system.


