Testing of equipment at the production of UTEX418 LLC
When designing and manufacturing a water deironing station with a capacity of 12 m3 / h, our specialists took into account the fact that the Customer’s company already has an installation for water deironing. As production capacity increases, there is a need to install additional equipment that should work as a single water treatment system.
Testing for uninterrupted operation of the installation, including the algorithm of the industrial logic controller Siemens, which will be responsible for all water treatment as a whole, the installation team conducts at the production of LLC “UTECH418” before shipping the equipment to the Customer.